The "COM?" button lists all available
communication ports for the PBV. If the Peak
Dongle drivers are installed and the Peak USB
dongle is connected, it will appear as
PCAN_USB:FD. Select the appropriate port and click
Enable. The Power Board Visualizer will
open the selected comm port.
Verify that everything is set up correctly by checking for status data and ensuring the system is in the PCS_PRECHARGE state.
Click the Start Pre-Charge button. The
System will charge the output capacitors in open
loop.
Click Start Power Transfer. The closed
loop will start. The user can use the voltage
slider to set up a new reference voltage.
The online versions of the documents are provided as a courtesy. Verify all content and data in the device’s PDF documentation found on the device product page.