6.6.2 RFD Project Verification

  1. RFD waits for provisioning parameters.
    Figure 6-143. Tera Term
  2. For guidance on the commissioning process, refer to the FFD Project Verification section from Related Links.

  3. Upon successful commissioning, the RFD will be integrated into the network and commence transmission of sensor data to the coordinator.
    Figure 6-144. Tera Term
    Figure 6-145. Power Consumption During Deep Sleep