5 Setting Up the Industrial Edge Demo

The demonstration involves the following steps:

  • Setting up the PolarFire SoC Video and ICICLE Kit
  • Setting up the Serial Terminal
  • Programming the Device

The following figure shows the board setup.

Figure 5-1. Board Setup of Industrial Edge Demo