1.7 Instructions for Power Transfer

This sequence of instructions must be followed once the appropriate Power Board Visualizer project has been opened:

  1. Select and Enable the correct communication port.
  2. Verify that everything is set up correctly by checking for status/housekeeping data and ensuring the system is in the PCS_PRECHARGE state. Confirm that the correct operation mode is programmed by examining the status flags.
  3. Click Start Precharge. The system will charge the output capacitors in open loop.
  4. Click Start Power Transfer. The system will quickly transition through various states and should eventually reach the PCS_UP_AND_RUNNING state.
  5. Change the reference to desired output voltage value, if necessary