Figure 40-17. Brown-Out Reset
Hysteresis, Trip Point (BORV = 10)
Figure 40-18. Brown-Out Reset
Voltage, Trip Point (BORV = 11)
Figure 40-19. Brown-Out Reset
Hysteresis, Trip Point (BORV = 11)
Figure 40-20. BOR Response
Time
The online versions of the documents are provided as a courtesy. Verify all content and data in the device’s PDF documentation found on the device product page.