7.6.5 Power Sequence Timing
Power supplies must adhere to the following rules:
- The VDDA supply must never be powered without VDDAU also powered.
- The VDDA supply must never exceed the VDDAU supply by more than 0.5 V.
- There is no power-up sequencing requirement, however all power supplies must reach operational levels within the time periods specified in Table 7-11.
- There is no power-down sequencing or timing requirement for VDDP relative to VDDA, however VDDA must not be powered for an extended period of time without VDDP also at operational levels.
- Following initial power-on, or if a power supply brownout occurs (i.e., either of the VDDA or VDDP supplies drops below operational limits), an internal power-on reset will be performed once all power supplies reach operational levels. Refer to the section Power-On Configuration Strap Timing for power-on reset requirements.
- Do not drive input signals without power supplied to the device.
Attention: Violation of these
specifications may damage the device.
Description | Symbol | Min | Typ | Max | Units |
Additional |
---|---|---|---|---|---|---|
VDDP supply turn-on time relative to VDDA | tpon | 0 | 5 | ms | Note 1 | |
Note:
|