4.1 Design Implementation

Each CPRI link connects two ports that have asymmetrical functions and roles: a master and a slave. The CPRI Demo design shows the CPRI point to point link between CPRI REC Master and CPRI RE Slave.

The top-level design includes the following SmartDesign components:

  • CPRI Master Subsystem
  • CPRI Slave Subsystem
  • Transceiver Subsystem
  • Mi-V Subsystem
  • Test Interface