Include detailed path information in this report: Check this box to include the
detailed path information in the timing report.
Limit the number of reported paths per section to: Specify the maximum number of
paths that SmartTime will include per section in the report.
Limit the number of expanded paths per section to: Specify the maximum number of
expanded paths that SmartTime will include per section in the report.
Limit the number of parallel paths in expanded path to: For each expanded path,
specify the maximum number of parallel paths that SmartTime will include in the
report. The default number of parallel paths is 1.